Chandigarh, May 6 (IANS) Haryana Chief Minister Nayab Singh Saini, on Tuesday, reviewed the progress of eight Namo Bharat corridor projects in the National Capital Region (NCR) under which three corridors are currently under implementation in first phase, officials said.
These are Delhi-Ghaziabad-Meerut (82 km), Delhi-Gurugram-Shahjahanpur-Neemrana-Behror (SNB) (105 km) and Delhi-Panipat-Karnal (136 km) routes.
During the meeting, the Chief Minister emphasised the transformative potential of the Namo Bharat corridors (Regional Rapid Transit System) in easing traffic congestion, boosting regional connectivity, and enhancing economic development across urban and semi-urban areas of the state.
He instructed officials to expedite approvals for the Delhi-SNB and Delhi-Karnal projects to ensure their timely completion.
During the meeting, a detailed presentation was made by National Capital Region Transport Corporation (NCRTC) Managing Director Shalabh Goel on detailed project reports, highlighting the features of the two Namo Bharat corridors.
The meeting was told that the Delhi-Ghaziabad-Meerut RRTS corridor has achieved significant milestones, with successful operations on a 55-km section and positive public response.
Chief Minister Saini suggested the design of the Namo Bharat corridors should be future-ready and efficient integration with metro systems should be ensured for enhancing the utility of the system.
The Chief Minister reviewed the alignment, stations and land requirements related to the Delhi-Gurugram-SNB and Delhi-Panipat-Karnal corridors.
He instructed departments to provide necessary support to NCRTC to ensure early start of projects.
He also reviewed the alignment of the proposed Gurugram-Faridabad-Noida Namo Bharat corridor and directed officials to provide necessary approval and support to NCRTC for preparation of the detailed project report.
The Namo Bharat train ensures high speed connectivity, covering 90 km distance in about one hour.
It will reduce the travel time between Ghaziabad and Gurugram from 100 minutes by road to just 37 minutes.
It will also provide fast and direct access to the Delhi airport from Haryana.
The Namo Bharat train has a maximum design speed of 180 km per hour with an inter-station distance of 5 to 10 km and train frequency of every 5 to 10 minutes.
It will also have platform screen doors and automatic fare collection system.
–IANS
vg/khz
Disclaimer
The information contained in this website is for general information purposes only. The information is provided by BhaskarLive.in and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Through this website you are able to link to other websites which are not under the control of BhaskarLive.in We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, BhaskarLive.in takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.
For any legal details or query please visit original source link given with news or click on Go to Source.
Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.
If you are not willing to accept this disclaimer then we recommend reading news post in its original language.