Bengaluru civic body presents surplus budget; plans world-class roads in IT corridor, tunnels, sky deck

24

Bengaluru, March 29 (IANS) A surplus budget for the Bruhat Bengaluru Mahanagara Palike in Karnataka for the financial year 2025-26 was presented on Saturday.

The budget promises world-class roads at a cost of Rs 400 crore in an IT corridor and also talks about ambitious tunnel projects, sky deck project to improve the infrastructure of Bengaluru and boost its image at the national level.

Dr. Harish Kumar K, Special Commissioner (Finance), presented the revised estimates for the year 2024-25 and the budget estimates for the year 2025-26 at the BBMP in the absence of elected representatives. The election to BBMP is yet to be held.

In 2025-26 BBMP’s total receipts will be Rs 19,930.64 crore which comprises of an opening balance of Rs.2.53 crore, revenue from its own resources Rs 11,149.17 crore and central and state government grants of Rs 8,778.94 crore.

This budget with the total expenditure of Rs 19,927.08 crore, a surplus of Rs.3.56 crore, is presented before the citizens of Bengaluru.

In Bengaluru, following the principle of “Pedestrian first”, emphasis will be given for the construction of 1,000 kms of footpath during the ongoing arterial and sub-arterial road works and also in all future road developments, Harish Kumar announced.

For the development of the area around Outer Ring Road from Central Silk Board to K.R. Puram-Lowry Junction Via Baiyappanahalli Metro Station where IT-BT companies with Fortune 500 status are functioning, 22.7 km road with world-class standards will be developed at a cost of Rs 400 crore with the collaboration of Government of Karnataka, BMRCL and BBMP, Harish Kumar stated.

For augmenting Bengaluru’s road infrastructure network aiming at alleviating traffic congestion and enhancing connectivity, it is proposed to undertake the following mega infrastructure projects: Urban vehicular tunnels at an estimated cost of Rs.42,000 crore; construction of elevated corridors/grade separators at an estimated cost of Rs 13,200 crore; construction of integrated metro and road flyovers (double deckers) at an estimated cost of Rs 9,000 crore; White topping of roads at an estimated cost of Rs 6,000 crore and sky-deck project an estimated cost of Rs 400 crore.

Currently, a D.P.R has been prepared at a cost of Rs.17,780 crore for the construction of tunnel road along National Highway No.7 from Hebbal-to-Hosur Road up to Silk Board which is set to be implemented in this year, Harish Kumar announced.

Additionally, a D.P.R. is being prepared for the tunnel project for East-West in National Highway No.4 from K.R Puram to Mysore Road.

Both tunnel projects, with the total estimated cost of Rs 42,000 crore will be implemented through BOT/HAM under private-public participation.

The Karnataka government has committed a guarantee of Rs. 19,000 crore.

The projects are being proposed under the Viability Gap Fund (VGF) method, where in 40 per cent project cost will be financed by the Karnataka government/BBMP through bank loans and rest 60 per cent is expected from the concessionaires.

–IANS

mka/rad

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by BhaskarLive.in and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of BhaskarLive.in We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, BhaskarLive.in takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

MGID