Hyderabad, March 4 (IANS) The National Dam Safety Authority (NDSA) has formed a six-member committee to inspect and study the design and construction of Medigadda, Annaram, and Sundilla barrages of the Kaleshwaram Lift Irrigation Scheme (KLIS), on the request of the Telangana government.
Irrigation Minister N. Uttam Kumar Reddy said on Sunday that the expert committee is scheduled to arrive on March 6 for a thorough examination of the Kaleshwaram project, and assured full cooperation from the state government to the team for its investigation.
He emphasised that the government would prioritise the recommendations of the NDSA.
The minister said that the committee, led by J. Chandrashekar Iyer, former Chairman of the Central Water Commission, would investigate the reasons behind the sinking of Medigadda barrage pillars and observe distress in the two upstream barrages, Annaram and Sundilla.
The committee, which has been given a deadline of four months to submit its report to the NDSA, includes U.C. Vidyarthi, a scientist from the Central Soil and Materials Research Station, Pune; R. Patil, a scientist from the Central Water and Power Research Station; Shiv Kumar Sharma from the CWC; Rahul Kumar Singh; and Amitabh Meena, both Directors of NDSA, as official members.
The minister said that the committee was formed following a request for a comprehensive investigation into the sinking of Medigadda barrage piers and potential damage to the Annaram and Sundilla barrages.
A NDSA team, which had inspected Medigadda barrage in October last year, recommended the immediate emptying of water. Following inspections of the Sundilla and Annaram barrages, it had identified similar issues and directed that they be emptied. Based on the NDSA directions, the state government promptly released the water.
However, Uttam Kumar Reddy said that the BRS leaders were trying to politicise the issue by demanding the filling up of those barrages. He said that BRS leaders lacked technical knowledge and criticised the previous BRS government for its careless execution of the Kaleshwaram project, neglecting quality, maintenance, construction, and designs, and breaking all rules.
Noting Medigadda barrage was like the heart of the Kaleshwaram project, which was built for Rs 94,000 crore, he expressed disappointment that BRS leaders were trying to play down the incident by stating that only one pillar had collapsed and accused the party of risking the state and farmers’ interests for political gains.
–IANS
ms/vd
Disclaimer
The information contained in this website is for general information purposes only. The information is provided by BhaskarLive.in and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Through this website you are able to link to other websites which are not under the control of BhaskarLive.in We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, BhaskarLive.in takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.
For any legal details or query please visit original source link given with news or click on Go to Source.
Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.
If you are not willing to accept this disclaimer then we recommend reading news post in its original language.