Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • Facebook
  • Twitter / X
  • Instagram
  • Youtube
BhaskarLive.in Bhaskar Live

Bhaskar English News

BhaskarLive.in Bhaskar Live

Bhaskar English News

  • TOP NEWS
  • NATIONAL
  • WORLD
  • ENTERTAINMENT
  • BUSINESS
  • SCIENCE
  • HEALTH
  • SPORTS
  • TOP NEWS
  • NATIONAL
  • WORLD
  • ENTERTAINMENT
  • BUSINESS
  • SCIENCE
  • HEALTH
  • SPORTS
Subscribe
Close

Search

TOP NEWS

Rail link to several NE states remains disrupted since two weeks after track subsidence in Assam

By IANS
August 6, 2026 3 Min Read

Guwahati, Aug 6 (IANS) The rail connectivity between southern Assam, Tripura, Mizoram, Manipur and the rest of the country has remained disrupted for more than a fortnight after heavy rainfall damaged railway tracks along the strategically important Lumding-Badarpur Hill Section, officials said on Thursday.

According to a senior Northeast Frontier Railway (NFR) official, train services on the vital Lumding-Badarpur Hill Section under the Lumding Division have been partially disrupted following incessant moderate to heavy rainfall in and around New Harangajao station in the mountainous Dima Hasao district (formerly North Cachar Hills district) of Assam.

The official said that continuous heavy rain triggered subsidence of the soil beneath two of the three railway tracks near New Harangajao station, affecting a stretch of nearly 300 metres and severely disrupting train operations.

He said that restoration work has been progressing under challenging conditions, but persistent moderate to heavy rainfall and inclement weather have significantly hampered repair efforts, delaying the resumption of normal services.

He said that a huge number of workers, railway personnel, engineering teams, and heavy machinery have been deployed on a war footing to restore the affected tracks and lines section at the earliest.

“We are unable to say when the normal train services would restart. Regular train operations are expected to resume once the restoration work is completed safely,” the official said.

According to the NFR official, the settlement of the railway tracks (Line 1 and Line 2) near New Harangajao station has disrupted train operations over the Lumding-Badarpur Hill Section.

At present, all train movements on the route are being operated through Line 3 under strict monitoring and enhanced safety measures to ensure safe passage of trains.

In view of the ongoing restoration work, the NFR has cancelled the Guwahati-Silchar Express on August 6 and 8, while many other trains connecting southern Assam, Tripura, Mizoram, and Manipur have either been rescheduled, regulated, or partially cancelled.

In the interest of passenger safety, the operation of passenger-carrying trains through the affected section has been suspended during night hours between 7 p.m. and 5 a.m.

During the daytime, trains are being allowed to pass through the affected stretch under regulated conditions with continuous and close monitoring.

Consequently, several trains operating along the Lumding-Badarpur Hill Section have been rescheduled, cancelled or regulated, the official said.

The Lumding-Badarpur Hill Section serves as the only rail link connecting Tripura, Mizoram, Manipur and southern Assam with the rest of the country, making it one of the most vital and strategically important railway corridors in the Northeast.

Any disruption on this route has a cascading impact on passenger movement as well as the transportation of foodgrains, fuel, construction materials and other essential commodities to the region.

Every year during the monsoon season, railway infrastructure across parts of the Northeast remains highly vulnerable to rain, floods, landslides and soil erosion, frequently disrupting the movement of both passenger and goods train along the Lumding–Badarpur Hill Section.

The four-month monsoon period, from June to September, often causes extensive damage to railway tracks, embankments, bridges and other railway infrastructure due to landslides, waterlogging and erosion, particularly in the mountainous terrain of Dima Hasao district.

As a result, several Northeastern states, especially Tripura, Mizoram, Manipur and parts of southern Assam, frequently face prolonged disruptions in rail connectivity with the rest of the country, causing considerable hardship to commuters and affecting the timely movement of essential commodities and commercial goods.

–IANS

sc/rad

Tags:

NEWS
Author

IANS

Follow Me
Other Articles
Previous

Delhi Lakshmi Yojana: Over 4.25 lakh women register; 1.49 lakh submit forms

Next

Centre introduces stricter penalties for fake data in drug applications

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

News Categories

  • BUSINESS
  • EDUCATION
  • ENTERTAINMENT
  • FINANCE
  • HEALTH AND MEDICINE
  • INTERNATIONAL
  • NATIONAL
  • SCIENCE AND TECHNOLOGY
  • SPORTS
  • TOP NEWS

About us

Bhaskar Live (bhaskarlive.in) is an English-language digital news portal that provides real-time coverage of national and international news, focusing on India-centric stories with a mix of original reporting and syndicated content. Launched in 2016, it serves as the English arm of the Dainik Bhaskar Group, one of India's largest media conglomerates known primarily for its Hindi-language newspaper, Dainik Bhaskar. The site is owned by Bhaskar Prakashan Pvt. Ltd.,

Terms of use

By accessing BhaskarLive.in, you agree to these Terms. This site provides news and information for personal, non-commercial use only. All content is copyrighted; reproduction requires written permission. You must not post unlawful, defamatory, or infringing material. We disclaim all warranties; content is provided "as is" without guarantees of accuracy. BhaskarLive.in is not liable for any damages from use. These Terms are governed by Madhya Pradesh law. We may update them anytime—continued use implies acceptance. Contact: bhaskarlive2019@gmail.com.

Disclaimer

This news is automatically published via auto feeds. No changes or modifications (editing) of any kind have been made to this news by the bhaskarlive.in team. The entire responsibility for this news and the materials used in it lies solely with the news agency. Before using the information provided in this news, please consult experts in the relevant field (lawyer / engineer / astrologer / vastu expert / doctor / news agency / other subject experts). Therefore, bhaskarlive.in news portal bears no responsibility for the related news and the text matter, photos, videos, and audio used.

Advertise with us

Email: bhaskarlive2019@gmail.com
Mobile: +91 - 9770324452
WhatsApp: +91 - 9424358037

Contact us

Bhaskar Prakashan Pvt. Ltd.
Email: bhaskarlive2019@gmail.com
Mobile: +91 - 9770324452
WhatsApp: +91 - 9424358037
Address: Bishambhar Bhavan, 18, Civic Centre, Jabalpur- 482002, Madhya Pradesh, India - 482004
Copyright 2026 — Bhaskar Live. All rights reserved.